Reaction plans
Introduction to Construction Quality Planning, Applying APQP to construction manufacturing, published by the Construction Innovation Hub in December 2019, states: ‘For high risks identified within the PFMEA (Process Failure Mode and Effects Analysis), a control plan is created. Just like the DFMEA (Design Failure Mode and Effects Analysis) and PFMEA, the control plan is product specific and should not be confused with a maintenance or asset care plan. The control plan provides for monitoring of high-risk features, product and process KC (Key Characteristic) through established error-proofing techniques or advanced inspection methods. In situations where a control method might fail, a reaction plan is also required. A good practice on a manufacturing shop floor is to have some key reaction plans in the form of laminated, numbered documents (for example: reaction plan 1, reaction plan 2 and so on) which can be quickly implemented when required.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Control plan.
- Not right first time.
- Plan, Do, Check, Act (PDCA).
- Product design requirements.
- Product validation.
- Production readiness review.
- Project quality plan.
- Quality control.
- Quality cost and delivery.
- Quality in construction projects.
- Quality load and capacity report.
- Quality.
Featured articles and news
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.